enLanguage
Home > News > Content

Aluminum Veneer Installation Location

Dec 05, 2023

1. Line: The D -step of the construction of the aluminum veneer curtain wall is to fix the skeleton and bounce the position of the skeleton. The skeleton is fixed on the main structure, and the quality of the main agency is checked before defense.
2. Fixed skeleton connector: welded the connector on the pillar of the main agency to fix the skeleton. Bone is anticorrosive. The position of the skeleton is accurate and the combination is firm. Check the center line and surface elevation after installation. In order to ensure the installation accuracy of the board, the latitude and weft meter should be used to penetrate the beam architecture. In the construction of the aluminum veneer curtain wall, special attention should be paid to the transformation seams, sedimentation and cross -section to meet the requirements of the use.
3. The last step of the construction of aluminum veneer curtain wall is to install aluminum plates: the installation and fixing of aluminum plates should be firm, reliable, and easy. The gap between board should be processed internally to make it smooth and smooth. After the construction of the aluminum veneer curtain wall is completed, plastic film or other materials should be used to cover and protect the parts that are easily polluted.

 

Send Inquiry